Recommended Control Cabinet Configuration for 200TPD Ore Processing Plant ,metrocrusher
2026-10-07
PLC Selection: No need for large redundant systems. Mainstream choices include Siemens S7-1200 or a small S7-1500 configuration. Domestic PLCs with mining industry track records (e.g., Hollysys LK series) are also viable. This level handles the logic interlocking and analog loops for a 200 t/d line.
Application of Jaw Crushers and Hammer Crushers in Gold CIL Plant,metrocrusher
2026-10-05
In a gold CIL (Carbon-in-Leach) plant, the crushing circuit is the first critical stage of size reduction. The PE Jaw Crusher and PC Hammer Crusher are commonly used in combination, with the jaw crusher serving as the primary crushing unit and the hammer crusher handling secondary or fine crushing duties.
Why the Thickener Gear and Reducer Gear Fail to Mesh?,metrocrusher
2026-10-05
When the drive pinion (on the reducer output shaft) and the large gear (on the thickener) cannot engage properly, the root cause almost always lies in one of four areas: center distance, shaft alignment, gear condition, or foundation rigidity. In practice, you need to check the entire drive train, not just the gears themselves.